新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Schaeffler opens development center in Kysuce: think tank for the mobility of tomorrow

13 Jul,2023

4.png

Schaeffler strengthens innovative strength for the mobility of the future with a global network of 20 research and development locations

Investment of 20 million euros in a state-of-the-art development center and new test and laboratory areas

By 2025, 500 developers will be working on the mobility of the future in Kysuce

Schaeffler is expanding its global activities for the development of modern mobility solutions. The company is now opening a new, state-of-the-art development center in Kysuce, Slovakia. Here the company develops products and components for e-mobility as well as chassis applications that are used, for example, for automated driving. In addition, the globally active automotive and industrial supplier is expanding its test center at the site with new test benches, test and laboratory facilities. In total, Schaeffler is investing around 20 million euros in the new construction and the expansion of the test facilities. "Innovative power is more than ever a decisive factor for our company's success. As a future-oriented technology company, Schaeffler therefore invests heavily in research and development – in Kysuce and worldwide,” says Matthias Zink, Member of the Executive Board Automotive Technologies at Schaeffler AG.

Around 4,300 people from 20 nations work at Schaeffler in Kysuce, more than 350 of them in development. By 2025, around 500 developers for the mobility of the future will already be working at the site. New jobs are therefore being created at the site, especially for partially and fully electrified drives, for example for e-axles and hybrid modules. “The region offers ideal conditions for Schaeffler. We benefit from excellent universities and research institutions with the appropriate technological expertise and experienced specialists from Slovakia,” says Milan Jurky, head of the Schaeffler location in Kysuce.

Innovations for the mobility of the future on the area of a soccer field

The newly built areas cover around 8,000 square meters - 4,000 square meters in the four-story development center and a further 4,000 square meters for test facilities and test benches. Schaeffler started construction of the new building at the end of 2021. After around one and a half years of construction, the first employees are now moving into the new development center. The special feature: The entire building was equipped according to the so-called "New Work Concept". This means modern office equipment, communication and collaboration zones as well as so-called gravity points for employee exchange. "We are gearing ourselves to the new requirements for flexible and digital collaboration and are designing the workplace of the future for our employees," says Milan Jurky.

At the site, Schaeffler covers numerous development activities for new products and customer-specific solutions. This includes system and software development, simulation and testing as well as hardware and mechanical product design. In addition, the specialists at the site take on extensive project management tasks for international customers from the automotive industry. In the adjacent production area, Schaeffler manufactures engine and transmission systems, numerous bearing variants, actuator systems, components for electric axles and hybrid drives, and chassis actuators such as roll stabilizers. The company thus benefits from the close integration of development and production at one location.

Kysuce is part of a strong global development network

The new development center in Kysuce is part of a strong global network with around 8,000 employees at 20 research and development locations. "At more than half of our development locations, we are working on sustainable electrified drive and mobility solutions and innovative chassis solutions for our customers worldwide," says Dr. Jochen Schr?der, head of the E-Mobility division at Schaeffler. The development locations for modern drives and chassis solutions include Wooster and Troy (USA), Puebla (Mexico), the German locations Bühl and Herzogenaurach, Szombathely (Hungary), Svitavy (Czech Republic) as well as Pune (India), Seoul (South Korea), Yokohama (Japan) and Taicang and Changsha (China). “We rely on a global development network with distinct local focuses and responsibilities. In addition, thanks to our global presence, we are always close to our customers and can respond quickly to local requirements,” says Jochen Schr?der.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 澳门十码三期准中| 1905电影网会员| 韩国电韩国电影伦理| 摔跤吧!爸爸| 免费科幻电影在线看| 澳门内部正版资料大全下| 举办体育赛事| 生于七月四日| 1999年的网络游戏| 神码论坛期期一码| 香港直播现场开奖直播633232| 澳门玄武版资料免费生肖号码| 北京遇上西雅图| 今晚最新澳门开奖结果| 好的图库摄影师| 澳门49彩开奖直播 | 河南女子醒来发现屋子被淹床在漂| 韩国八哥电影| 2024新奥开奖记录39期| 一码三中三 资料中奖| 澳彩免费资料观看下| 新澳门管家婆一码一肖一特一中| 新澳2024年精准资料期期公开不变| 2023澳门开奖结果历史记录表| 澳门特马料| 比较好投的体育类期刊| 113影视网WWW大全| 澳门四肖四码精准资料| 2024老奥历史开奖记录52期| 7777888888管家婆资料| 倾爱在线电视剧免费观看全集高清| 澳门今期开奖结果澳| 494949cc澳门免费资料| 快乐八开奖结果开奖号码大| 澳门开彩开奖结果2021| 看澳门开奖结果| 白小姐一肖一码准最新开奖结果| 爱源成人用品专营店 | 澳门一肖一码100精准2023图库| 2024澳门天天彩全年免费| 澳门六开彩开奖结果和查询最新|