新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Bigger than a soccer field: A photovoltaic system with an area of around 7,400 square meters is being built at Schaeffler in Bühl

24 Jul,2023

2.png

Construction of the solar system in the Bu?matten commercial area with around 3,700 photovoltaic modules will begin in July 2023

The system with a total output of around 1,500 kilowatts peak increases the security of supply at the Bühler Schaeffler plant

Construction of additional solar systems planned in Sasbach, Kappelrodeck and in the Bühler main plant

Schaeffler in Bühl relies on solar energy. Construction of the first photovoltaic system on the Bühler campus will begin in July. In the coming weeks, a total of around 3,700 photovoltaic modules will be installed on the previously unused roof of a production hall in the Bu?matten industrial park. The total area of the modules is more than 7,400 square meters - larger than a football field with a standard playing field. The system has a peak output of around 1,500 kilowatts. In the future, around 1,400 megawatt hours of electricity can be fed into the Schaeffler plant's power grid for internal use. For comparison: in a single-family house, the average consumption without hot water is around 3,000 kilowatt hours. The performance of the new system in Bühl corresponds to the average power consumption of around 470 single-family homes.1 "Sustainability has a high priority for the Bühler Schaeffler location," says Andreas Maier, head of the campus in Bühl, which also includes the locations in Bu?matten, Sasbach and Kappelrodeck. "With the installation of the photovoltaic system, we are making an important contribution to increasing the security of supply at our site and promoting the energy transition." In the fourth quarter of 2023, electricity from the roof of the production hall should be available for the site for the first time.

Schaeffler is implementing the construction together with the companies NEWI-Solar GmbH, Kühn Elektrotechnik GmbH and the public utility company in Bühl.

A total of four photovoltaic systems are planned

The installation of its own photovoltaic systems is a further step taken by Schaeffler to achieve its sustainability goals: by 2025, ten percent of the electricity required worldwide and by 2030 a total of 25 percent should come from self-generated renewable energy. From the year 2030, production in all plants worldwide should be climate-neutral. The Bühler Schaeffler site has therefore been sourcing 100 percent of its electricity from renewable energies since 2020. In addition, targeted energy efficiency measures are implemented in the plant. In addition to the construction of the photovoltaic system in Bu?matten, other systems are also planned for the future: In March 2024, modules are to be installed on the roof of the plant in Kappelrodeck, followed by the roof of the plant in Sasbach in June 2024. Finally, in 2025, the construction of a fourth solar system in the Bühler main plant is planned.

Promote biological diversity

Schaeffler assumes ecological and social responsibility not only in climate protection, but also in relation to other aspects of sustainability. At the end of June 2023, the company put a so-called insect hotel into operation in Kappelrodeck. It is one of the site's projects that specifically promote biodiversity and provide nesting aids for insects. The construction goes back to an initiative of the "Schaeffler Climate Action Day", which took place on June 22, 2022. At that time, all of the more than 83,000 employees at the Schaeffler Group’s approximately 200 locations worldwide were concerned with the topic of sustainability. They collected ideas on how to reduce CO2 emissions in all areas of the company and how the company can work even more sustainably. On the occasion of the one-year anniversary of the "Climate Action Day", the Bühl site implemented the construction of the insect hotel. In addition, an insect-friendly flower meadow is to be built in Kappelrodeck and three apiaries in the Sasbach plant.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 穿越时空的古宅| 澳十开奖网| 港彩全年历史图库| 2024澳门全年正版资料大全 | 新奥新澳门六开奖结果资料查询| 80s电影网科幻电影高清| 澳门资料全年免费大全| 99影视网在线电影| 奥门今天晚上开什么号码| 足球赛事最近| 星空影院电视免费播放生活在还一| 澳门精准资料期期精准每天更新私人网站| 2024年香港正版资料免费直播| 最近的体育赛事有哪些| 澳门开彩开奖结果2021| 绝命毒师第二季高清在线观看免费 | 容易发表的体育类期刊| 新澳门2024资料大全1| 123696澳门六下资料2021年功能| 澳门天天乐彩开奖结果查询 | 老澳门10点30开奖结果| 澳门六开彩开奖结果十开奖结果 | 不忠免费在线高清完整播放| 管家婆一肖一吗100‰| 2024年澳门图片资料| 钢铁是怎样炼成的高清电影 | 国内旅客运输进项税| 功夫厨神电影免费观看完整版国语高清 | 2O24澳门天天开好彩大全| 全集在线观看高清电视剧| 三期必中一期精选| 2024澳门挂牌正版挂牌今晚| 香港最快直播现场| 美好的普通人豆瓣| 最准五肖五码| 我脑中的橡皮擦| 资料大全正版资料\| 澳门99905资料网| 今晚体育频道有篮球比赛吗 | 澳门开奖.| 澳门新澳开奖2024开奖记录查询 |