新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Schaeffler Expands Charging Infrastructure Worldwide

22 Aug,2024

1.png

The Motion Technology Company Schaeffler continues to drive forward the expansion of the charging infrastructure at its locations. More than 5,000 additional charging points for electric vehicles are to be constructed worldwide by 2030. These include 3,000 charging points at European locations alone. This measure is part of Schaeffler’s sustainability program. The locations Herzogenaurach and Schweinfurt are acting as pilot projects for the technology and the operator model. Following the successful completion of the test phase, the project will be gradually rolled out in all other regions of the Schaeffler Group.

“Schaeffler stands for sustainability and is committed to e-mobility”, says Andreas Schick, chief operating officer of Schaeffler AG. “We are pursuing the higher-level objective of reducing our CO2 emissions on a continuous basis. This includes the carbon footprint for individual mobility. Through this project, we will increase Schaeffler’s attractiveness as a sustainable employer and further motivate our workforce to act in an environmentally conscious manner.”

Pilot projects in Herzogenaurach and Schweinfurt

As part of the redevelopment of a parking lot in Herzogenaurach, 40 charging points have been installed, which are initially available for employees without charge. These charging stations are the standard model used at all Schaeffler locations. They provide up to 22 kilowatts of charging capacity per station and are to be operated and maintained by an external partner in the future. The expansion plan for the Herzogenaurach location allows for the construction of a further 245 charging points for employees, company cars, and visitors in 2025. In Schweinfurt, the electrical infrastructure will first be expanded to allow the construction of a further 122 charging points. Initial operation is planned for 2025.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 161633澳门开奖结果| 澳门澳彩开奖结果+开奖记录表香| 626969澳门资料2023年| 2o24年澳门正版精准资料| 香港最大论坛彩澳门| 泛解析苹果cms二开| 我绝不轻易狗带| 澳门马开奖2024今期开奖结果 | 精灵鼠小弟3国语版免费| 篮球体育运动木地板价格| 4949澳门精准免费资料大全| 黎明前的抉择电视剧全集在线观看| 韩国变态杀人案电影| 澳门玄武版资料免费生肖号码| 2023年澳门天天开彩资料| 2024年新澳门内部精准资料| 2024年香港港六+彩开奖号码| 星空影院在线高清观看| 四川雅安暴雨已致8人遇难| 体育类学术期刊有哪些| 2024.2.14澳门开奖结果| 香港二四六开奖免费结果118| 偷偷藏不住电视剧星辰影视在线观看| 上海体育赛事公司| 澳门一肖一码一特一中| 新澳门2023六合资料大全| 体育比赛怎么报名| 澳门码运势精准计算| 正版资料免费大全精准版资料软件介绍 | 2020年大型网络游戏| 重回蓝色珊瑚礁| 333电影网WWW迅雷| 2025澳门特马今晚开奖号码是多少| 49619澳门免费资料图| 新奥彩294444cm| 澳门选一肖一码最新版| 皎月流火电视剧星辰影视| 49719澳门资料| 772288:王中王开奖结果.,,查询一一 | 地球最后的夜晚电影免费观看完整版 | 2024年6合和彩开奖记录|