新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Schaeffler Opens New Logistics Center in Kitzingen

06 Jun,2018


European Distribution Center Central goes into operation

Investment volume of around 110 million euros, increased customer focus

Bavaria’s state prime minister Dr. Markus Söder recognizes the Schaeffler Group’s commitment in Lower Franconia

The Schaeffler Group has inaugurated its new European Distribution Center (EDC) Central in Kitzingen (Germany). Products from Schaeffler’s Industrial division are shipped for the European market from Kitzingen. During the official opening ceremony of the central warehouse, Georg F. W. Schaeffler, Chairman of the Supervisory Board of Schaeffler AG said: “This new logistics center at our new Kitzingen location is a further milestone in the implementation of our strategy ‘Mobility for tomorrow’. At the same time, we regard the new EDC Central as a commitment to the Franconian region, to Bavaria and to Germany as a location.” Schaeffler has invested around 110 million euros in the construction of the new location in Lower Franconia. Approximately 100 employees currently work in Kitzingen, but that number will increase to around 200 by the middle of next year.

With its conveniently located position in the center of Europe, Schaeffler’s new central warehouse in Kitzingen is the central point of Schaeffler’s European warehouse network. Until now, the network of European distribution centers (EDC) has comprised a warehouse for Northern Europe in Arlandastad, Sweden and a warehouse for Southern Europe in Carisio, Italy.

In addition to the company’s headquarters in Herzogenaurach, Middle Franconia and the new location in Kitzingen, Lower Franconia, the globally active automotive and industrial supplier Schaeffler is present at ten further locations in Bavaria. The Bavarian State Prime Minister Dr. Markus Söder, who attended the inauguration of the EDC Central as honorary guest, said: “Kitzingen is now the center of Schaeffler’s European logistics system. This is a huge investment for Schaeffler AG and an excellent development for Lower Franconia as a location and Bavaria as a whole!”

The realignment of Schaeffler’s logistics system with the European distribution network is part of an initiative in the future-oriented program “Agenda 4 plus One”, which will make Schaeffler more flexible, faster, and bolder, as Klaus Rosenfeld, CEO of Schaeffler AG explains: “The main objective of our investment in Kitzingen is to make the entire global supply chain, from our suppliers and our production network through to our customers, more cost-effective, faster and more flexible. This means that the new EDC Central will help directly to improve our ability to supply and ensure the future competitiveness of the Schaeffler Group.”

With the European distribution network, Schaeffler wants to increase the market supply, delivery reliability, and delivery performance and thus increase customer satisfaction even further. As a result, Schaeffler’s standard products can be delivered to customers in Europe from the EDC Central within 24 to 48 hours after receipt of the order. In addition, a customer order can be accepted and dispatched as little as two hours before the delivery trucks leave the site. Furthermore, Schaeffler is able to ensure special customer requirements such as the shipment of goods in containers or the customer’s own packaging, for example. Special sorting processes and marking with recipient-specific labels are also possible.

The ground-breaking ceremony for the EDC Central took place at the 148,000 square meter site in the conneKT-Technologiepark in Kitzingen in October 2016. The development comprises a 38.5-meter-high high bay storage warehouse with 28,000 Euro pallet storage spaces and an automated container warehouse with almost 95,000 storage spaces. These loading aids are transported using an electrified floor track system and state-of-the-art conveying technology with a length of more than 2,000 meters. Up to 85 trucks can be loaded and unloaded daily on 20 ramps. With a base area of around 17,000 square meters, the logistics area has a usable hall space of around 25,000 square meters in the warehouse, which is partly on two floors.

Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 2023澳门开奖历史记录资料 | 香港四不像图资料正版| 808影院网WWW播放| 货运运输方式| m6cc澳门天天彩| 新奥最精准免费大全新闻| 农夫山泉有点甜电影高清完整版| 临时劫案粤语在线观看高清免费| 货物运输物流公司| 美版生人勿进演员当时几岁?| 2024新澳门天天开彩免费资料| 2021悬疑电影排行榜 | 体育游戏有哪些| 789电影网影视大全| 澳门四肖八码最新版本号| 光棍影院2o10l9最新版| 澳门铁算盘48369_com| 五行相生相克的精准排肖| 2021年澳门开奖记录历史| 澳门精准一码发财2022年| 夫妻生活一周不要超过| 333电影网剧情篇高清| 东北虎电影高清在线观看| 不归路电视剧免费观看完整版国语星辰影视| 香港澳彩开奖结果+开奖结果| 香港王中王中特精选玄机| 体育科技是核心期刊吗| 新澳门一肖一码100准免费资料| 2024澳门正版彩民之家| 2024年新奥门天天| 香港心水资料| 2024一肖一码100精准大全| 2024澳门特马资料图59期| 086影院电影迅雷| 麦兜·饭宝奇兵| 今天十五选五开奖公告| 新澳门100期开奖记录查询| 2021日韩中文字幕韩国推理电影| 2023澳门精准免费大全| 808影院网喜剧播放| 澳门管家婆三码三肖必中|