新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Caterpillar Announces Hydrogen-Hybrid Power Solution Program for Off-Highway Applications

11 Dec,2023

7.png

Caterpillar has announced the launch of a three-year program to demonstrate an advanced hydrogen-hybrid power solution built on its new Cat C13D engine platform.

Starting in the first quarter of 2024, Caterpillar will develop a transient-capable system for off-highway applications. The project will demonstrate how state-of-the-art control systems and electric-hybrid components can help hydrogen-fueled engines meet or exceed the power density and transient performance of traditional diesel engines.

Caterpillar will serve as the prime contractor on the project, providing engine research and development as well as system integration. As the project progresses, other industry and academic collaborators will be brought into the program to provide additional specialist expertise. The initiative will be delivered at Caterpillar facilities in Chillicothe, IL. and San Antonio, Texas.

With research commencing in 2024, the project is supported and partially funded by the U.S. Department of Energy’s (DOE) Vehicle Technologies Office (VTO) through the Office of Energy Efficiency and Renewable Energy (EERE). It is included among 45 projects across 18 states and Washington, D.C., receiving funding to advance research, development, demonstration, and deployment in several areas critical to reducing greenhouse gas (GHG) emissions in the transportation sector.

The hydrogen-hybrid power demonstration project is the latest in a series of initiatives that builds upon Caterpillar’s 35 years of enterprise experience in hydrogen fuels.

“Every off-highway application has its own unique duty cycles, lifecycle demands and performance expectations, and this complexity is driving the development of a wide range of power solutions for the energy transition,” said Steve Ferguson, senior vice president Caterpillar Industrial Power Systems. “One size does not fit all, which is why we’ve engineered flexibility into the C13D engine to serve as our platform of the future.”


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 欧罗巴欧罗巴| 新澳门今晚开特马开奖9494期| 澳彩开奖免费资料 | 新澳门天天开彩二四六免费| 香港6合和彩开奖直播| 女射手座今日运势最准| 澳门开彩开奖+结果2022今晚302| 港彩二四六天天好资料| 今日快8开奖结果| 澳门六叔新澳门和老澳门| 841995澳门论坛王中王l| 澳门开奖历史近15期记录表 | 南粤影视网完整版| 161633澳门开奖结果| 2024澳门12生肖表图片 | 正版澳门资料网站大全免费| 澳门图库资料大全最新版本| 神算子王中王精准资料| 2022新出的网络游戏| 白小姐三肖三期必出一期开奖三 | 澳门好彩澳门天天免费资料| 今天快八开奖结果| 澳门一肖一码全年资料| 84995澳门论坛资料库生肖表| 新澳正版资料大全免費| 澳门开奖123论坛| 澳门精准四肖四码期期准V | 电视剧暗夜与黎明免费在线观看| 下载澳门宝典2024最新版| 爱的色放韩国在线电影| 暗夜与黎明免费播放王志文电视剧| 123香港开奖网| 2023年韩国大尺度电影排行榜| 陈老师一码三中三| 二字爆特1码澳门| 333电影网科幻电影在线| 新奥门四肖八码精准资料| 澳门资料大全正版资料2023年免费网站 | 黄频网站免费观看麻豆| 2023年澳门开奖全部记录| 管家婆一肖一码最准资料92期|