新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Jeff McClanahan on taking a systems approach to control panels to solve electrification challenges

13 Mar,2024

2.png

Industrial organisations can push decarbonisation forward by shifting process heater systems from fossil fuel-burning to electric. This kind of electrification needs to be done with a systems approach in mind – by considering the entire thermal loop. Of all the components needed to switch to electric, control panels are one of the most important. For large-scale applications, control panels need to be designed to maximise reliability, accessibility and safety. Here, we explore why systems approach thinking is key in the manufacturing of components for electrification.

The question of electrification is less of an if or a when, and instead how. Globally, companies are prioritising the reduction of their carbon footprint. There is a huge push across different industries to “go electric” as part of a larger programme of decarbonisation. But the details for doing so can be elusive. It’s not as easy as swapping out gas-fired heaters for electric heaters, for example, without also considering the size, location and connectivity of the control panel that will regulate those electric heaters. These considerations will, in turn, have a bearing on how and when the system needs to be maintained, how long downtime lasts and what the prospects are for future expansion.

The point of a systems approach is to take a step back, seeing how different design considerations an impact on the system and process might have as a whole, rather than focusing on the functioning or replacement of a single part. A systems approach also has an impact on the business aspects of an industrial process, as it encourages engineers to consider the total cost of ownership when comparing different options.

Meeting challenges at scale

Taking a systems approach to process heating was a foundational consideration behind the design of Watlow’s L and XL Watconnect control panels. Here, we take a deeper look at what went into that design as a way of illustrating the power of this kind of thinking.

A systems approach means finding not just one or two solutions to meet a challenge, but finding as many solutions as possible to optimise a given outcome. Take reliability, for example. What are all of the different ways a system can be optimised to ensure near 100% uptime? One way this was done in the design of the Watconnect panels was by looking at the thermal design of the system. All systems generate some heat, and excess heat is the nemesis of electronics. Therefore, optimising the system to keep heat under control is critical.

Watlow’s design looked at adding to the insulation of the system, reducing power where possible, and improving the airflow throughout the system. Airflow itself was improved by using high-reliability EC inlet and outlet fans with advanced monitoring, which provide up to twice the airflow compared to industry standard fans. Therefore, by better controlling waste heat within the panel, Watlow can extend the life of the electronic components and significantly increase reliability.

Other design considerations include accessibility options. A smaller panel door in the unit provides access to 90% of the system while still shielding the user from high-voltage components. This allows a person to troubleshoot the system while running, and without the safety concerns that come from opening the panel while “hot.” This also ensures longer uptime, as the panel does not necessarily need to be shut down for investigating smaller issues. The panels are also designed with solid copper internal power interconnect for less expansion and contraction. This is especially important at high-resistance junctions, because the more this component heats up when made from an alternative to copper, the higher the risk of failure.

Lastly, although the panels are categorised as large, they use only 50% of the space that competitive panels require. This can make it easier to install the panels when space is limited. Or, if replacing current equipment, the savings potentially frees up space for other critical equipment, allowing for future expansion.

Industrial organisations can push decarbonisation forward by shifting process heater systems from fossil fuel-burning to electric. But this is not a simple swap-out. A systems approach must be taken to consider how individual components will affect the entire system.

Although control panel technology is nothing new, there are fresh new challenges that come with building control panels for large-scale applications. To be effective in solving electrification challenges, these control panels need to be designed to maximise reliability, accessibility, safety and provide a smaller footprint.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 澳门码今晚上开奖结果| 澳门四肖八码期期准免费资料| 4949新澳门免费的资料| 星光影院免费观看电影电视剧| 澳门彩资料大全书958| 男双鱼座今日运势最准| 快乐八开奖结果开奖号码大| 澳门精品图库开奖记录2024年| 2023年新澳门正版资料公开 | 机器人跆拳V| 668影视网WWW迅雷| 澳门一码一肖一特一中酷知经验网| 澳门免费公开资料大全最新| 正版资料全年资料大全| 新澳门高手资料免费公开| 我只需要你电视剧免费播放| 纽约客@上海演员表| 丛林探险电影排行榜| 当下最火爆的网络游戏| 澳门正版资料免费长期公开| 2022年新上映的电影排行榜| 新好莱坞种子下载| 阿飞彩图香港阳飞彩图库| 2021澳门8中特期期准| 香港正版通天报资料| 电视剧等你爱我免费看| 澳门四肖八码期期准免费开| 奥门2024一肖一马开奖| 将夜电视剧星辰影院在线观看| 2022年澳门六下彩资料网址| 2020年最新电影排行榜| 香港十二生肖开奖号码| 澳门一肖一码免费公开软件| 韩国邻居电影| 无锡一点通金属科技| 新澳彩开奖结果2023开奖记录| 平凡的世界星辰影院电视剧| 新澳最快开奖记录| 电影影史票房排行榜| 奥门49码开奖记录| 香港心水资料|