新澳门中特网站合法吗,二四六天天好(944cc)46天彩,彩色港彩全年历史图库,2025天天开好彩免费大全,2025正版跑狗图

Schaeffler Expands Charging Infrastructure Worldwide

22 Aug,2024

1.png

The Motion Technology Company Schaeffler continues to drive forward the expansion of the charging infrastructure at its locations. More than 5,000 additional charging points for electric vehicles are to be constructed worldwide by 2030. These include 3,000 charging points at European locations alone. This measure is part of Schaeffler’s sustainability program. The locations Herzogenaurach and Schweinfurt are acting as pilot projects for the technology and the operator model. Following the successful completion of the test phase, the project will be gradually rolled out in all other regions of the Schaeffler Group.

“Schaeffler stands for sustainability and is committed to e-mobility”, says Andreas Schick, chief operating officer of Schaeffler AG. “We are pursuing the higher-level objective of reducing our CO2 emissions on a continuous basis. This includes the carbon footprint for individual mobility. Through this project, we will increase Schaeffler’s attractiveness as a sustainable employer and further motivate our workforce to act in an environmentally conscious manner.”

Pilot projects in Herzogenaurach and Schweinfurt

As part of the redevelopment of a parking lot in Herzogenaurach, 40 charging points have been installed, which are initially available for employees without charge. These charging stations are the standard model used at all Schaeffler locations. They provide up to 22 kilowatts of charging capacity per station and are to be operated and maintained by an external partner in the future. The expansion plan for the Herzogenaurach location allows for the construction of a further 245 charging points for employees, company cars, and visitors in 2025. In Schweinfurt, the electrical infrastructure will first be expanded to allow the construction of a further 122 charging points. Initial operation is planned for 2025.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 电视剧黎明之前全集播放| 降灵记在线高清免费观看 | 管家婆2024正版资料大全| 精准四肖期期准选一| 澳门金牛版42260cm| 快乐八开奖结果 开奖号码今天| www在线观看在线| 澳门正版资料免费公开手机| 运输 物流运输| 777777888888精准新传真| 聚彩堂免费资料大全| 大揭秘在线观看免费完整高清| 2021年澳门开奖记录录十结果| 2025新澳门正版免费正题全部视频资讯 | 正版全年免费资料大全免| 澳门最准真正免费资料大全| 澳门最快最准马资料| 你是我的荣耀电视剧免费观看星辰影视 | 为了中考体育要每天怎么训练?| 澳门最快开奖9494开奖记录表| 今天十五选五开奖公告| 2022年澳门626969免费资料| 后浪电视剧在线观看全集免费完整版高清 | 2022澳门天天彩正版资料| 三码必中免费858449| 港澳彩049.coe| 一肖12码中特期准| 体育生可以报考| 美版午夜凶铃到底是讲什么 | 新澳门出彩综合走势图2024| 国内旅客运输进项税| 86949澳门资料| 动感影视网免费| 为希斯莱杰写的歌| 2024港澳宝典免费资料| 澳彩2021年免费全年资料大图库 | 孤芳自赏电视剧全集免费观看高清| 澳门现场开奖结果+开奖记录澳| 管家婆王中王六肖中特 | 奥门开奖记录 开奖结果| 2023澳门天天开好彩开奖结果 |