Vesconite hydro turbine parts replace bronze

27 Apr,2023

4.png

Hydro turbine bearing components machined from Vesconite Hilube have been installed at the Crai Water Turbine and Pollok Sawmill Projects in Wales.

The UK consultant on hydroelectric turbine design and maintenance on the project had first come to hear about Vesconite bearing materials in 2021 when the restoration projects were still in the conception stage.

The company sent an inquiry for wicket gate bushings and wear rings for the two projects. 

The scope of the bushing supply increased and Vesconite Bearings was eventually the supplier of all the plain bearing components in the projects, including the guide vane bushings, runner inlet wear rings, several thrust bearings and the Francis turbine main shaft bearings.

All the parts were delivered in January 2022, installed in the turbines, and despatched to the client in December 2022 after successful factory acceptance tests and some preliminary testing of the bushings under a controlled environment.

Vesconite renewables applications developer Petrus Fourie notes that the previous bearings were made of bronze, but the restoration project necessitated a rethinking of some of the older technology that was in use when the hydro projects were first built.

“People like replacing bronze because they want to eliminate grease from systems in which water is present,” says Fourie.

“Water flushes out the grease ? which pollutes the water. When the grease is flushed out, metal shafts are left unprotected and corrode,” he adds.

Vesconite Hilube bearings are often used in niche hydroelectric applications since they can be machined easily for older equipment with unique designs.

Besides being used in huge hydro-power stations, Vesconite Hilube bearing material is also used in smaller projects such as the Crai Project, operated by Welsh Water, and the Pollok Project, operated by the Glasgow Council.

In England and Wales, there are many modest hydro projects that could generate 100 to 150 kW of electricity, as many areas are mountainous with a significant rainfall.


Contact Us

Address:Room 1306, Building 7, Xingguang International Financial Center, Development Zone, Liaocheng City
Tel:0635-8263099
        0635-8262099
Email:admin@aglzc.cn

Online Inquiry
Company Name*
Name*
Phone*
E-mail*
Message
Copyright ? 2018 - Shandong Ao Gang Lian Bearing Co., Ltd. Technical Support - Bearing.cn ICP:鲁ICP备19054627号-1
主站蜘蛛池模板: 漠河县| 苍梧县| 密云县| 花莲县| 舞阳县| 大邑县| 施甸县| 南江县| 正阳县| 滨海县| 花莲市| 丹江口市| 吴川市| 永定县| 陇西县| 栾川县| 晴隆县| 四平市| 泗水县| 勃利县| 从化市| 东源县| 桂平市| 南丹县| 广元市| 苍梧县| 奈曼旗| 巩留县| 延边| 丹棱县| 无为县| 勐海县| 南康市| 贡嘎县| 莲花县| 虞城县| 曲阳县| 嘉义市| 防城港市| 青阳县| 石棉县|